AJ Fistes Corp

General Construction and Painting since 1983

Here are some of the many projects we have completed in the past along with the work we performed within those projects that we received to execute at the best quality possible.

Bert Lynn Middle School

1. Metal Stud Framing

2. Drywall

3. Plaster

4. Painting

5. Specialties

South High School

1. Plaster
2. Gypsum Board
3. Metal Stud Framing
4. Acoustical Ceiling
5. Painting
6. Insulation

Seaside Elementary School

1. Metal Stud Framing
2. Drywall
3. Plaster
4. Painting
5. Specialties

Fern Elementary School

1. Rough Carpentry
2. Gypsum Board

Carr Intermediate School

1. Drywall
2. Plaster
3. Acoustical Ceiling
4. Tackpanels

UCLA Painting Joc

1. Interior Painting of 700 dorms

Harbor Hills Housing Development

1. Exterior Painting

Van Nuys High

1. Elastomeric Exterior Coatings

Indio Education Center

1. Metal Stud framing

2. Drywall/Drywall finishing

3. Exterior sheeting/waterproofing

4. Lath and plaster

City Of Anaheim

1. Epoxy and Urethane coating streetlights, CMS signs and Light Poles